Installation

The survey of your property will result in a report of our findings sent to you which will detail solution and requirements within the installation.

Installation Flow

1.

Choose a cross flow vent system, always use WAD + Dryvent/ Bluray, Home: Kitchen & Bathroom, Cellar: pair for crossflow

2.

Identify unit location carry out risk assessment

3.

Plan installation, insure you have all materials required

4.

Use good quality core drills with dust extraction

5.

Cut level holes for BluRay/VapourVent ,other units with slight downward angle to the external

6.

Fix units to the wall with wall sleeve,ensure the casing does not get distorted during fixing

7.

Competent person must do the electrics as detailed in the electrics section, following instructions carefully

8.

Power up and leave running for minimum 5 minutes, after this period it goes in to normal operating mode

9.

After 48 hours the unit will settle down into reacting to your life style, all the units run continuously on trickles mode with auto high and reverse operations.

10.

Leave the units to run themselves, they will give you a dryer home to enjoy