Author Archives: Ray Hudson

Blogs

Property Review/Survey for Air Moisture Control including Installation Solution

The onsite review of your property will enable an experienced professional within ventilation system design, to evaluate your home. The evaluation considers the use of the home, along with the known breathability condition of the dwelling envelope. Account is taken of the flow of air in and out of the property, along with the flow […]

Condensation Control Foundation System

The system will provide preconditioned air (slightly warmed when external air is below 14ºC) through a bathroom vent then on to the rest of the dwelling. When the bathroom is in use the unit extracts air, the bathroom use triggered by the light switch and or auto humidity detection. The kitchen unit extracts continuously with automatic […]